Product Variations
- Bag of 20 - $6.00
- Bag of 100 - $30.00
Place zero mark and bottom of 7D Z Clip™ Wall Rail and move up to push wall rail out for desired depth. You must start at the zero mark. Our 6” shim only works with panel installation when the wall rail is projected off the wall from ¼” to ½”. See our videos for helpful installation directions.
Do not leave shim exposed to UV rays for long periods of time. ABS becomes brittle with long periods of UV ray exposure.